Steel and concrete building module and connections
US20220235547A1 · office US · priority 2021-01-26 · published 2022-07-28
The construction of buildings can be time consuming and error prone. Building modules constructed off-site and pre-furnished can be made more efficiently than building everything on-site. Building modules are disclosed with a reinforced, precast concrete floor with thickened edges, and a …
Inventor: Gregory Zemrau · Assignee: Emerge Modular Ltd
Open the patent document · source query “earthquake resistant building”